Straight answers on consents, CAR and traffic management

Council paperwork has its own language, AEEs, s92s, CARs, WAPs, TMPs, and most of what you'll find online is written either by councils (accurate but dense) or by consultancies (vague, because they want you to call before they'll tell you anything). This library exists because we got tired of both.

Every guide here answers one question someone has actually asked us, usually after a letter from Christchurch City Council landed on their desk, or a contractor told them the digger can't start until a permit exists. We write them in the plain English we'd use across the table, with real council names, real process steps and indicative numbers where we have them. Where a figure depends on your job, we say so.

No "it depends" without the "on what". No jargon without a translation.

The guides

What a resource consent costs in Christchurch, and how long it takes

The page nobody else in New Zealand publishes: honest cost ranges (consultant fees versus council fees, and what each pays for), realistic processing times for Christchurch City Council, Selwyn, Waimakariri and Environment Canterbury, what inflates the price, and what you can do to keep a consent cheap and fast. Read this before you sign anything.

Corridor Access Request in Christchurch, step by step

The genuine end-to-end walkthrough: whether you need a CAR at all, how CAR, WAP and TMP differ, lodging in MyWorksites, what the road controlling authority checks, the Works Access Permit, the Work Completion Notice, and the two-year warranty that follows you after the job. Written for the builder who opened MyWorksites and stared at the form.

What a traffic management plan costs in NZ

TMP quotes in this market range from a few hundred dollars to several thousand, and almost nobody explains why. This guide does: indicative price ranges by job type and risk level, the factors that move the number, the difference between a TMP drawing and actually managing traffic on site, and when the law says you need one.

Section 92 request: what it is and how to respond

Got a letter saying your consent application is on hold under Section 92 of the Resource Management Act? This is the explainer: what the letter actually means, why the processing clock stops, how to respond once, properly, instead of bouncing back and forth for months, and what to do if you think council is asking for something it doesn't need.

Vehicle crossings in Christchurch: consent, CAR, TMP and inspection

You wanted a driveway. Council wants a consent check, a corridor access request, a traffic management plan and an inspection. This guide untangles the chain, who does what (you, your contractor, us, CCC), the order the steps happen in, indicative costs, and the mistakes that get crossings dug up.

Built without consent? Your fix-it options

For anyone who built, or bought, a sleep-out, garage, deck or minor dwelling that was never consented. The difference between a retrospective resource consent and a Certificate of Acceptance, what unconsented work does to a house sale, and the realistic pathways from "problem" to "sorted".

Not sure which question you're even asking?

Send it through. We'll review it and respond with a clear scope, usually within one working day.

How to use this library

Each guide stands alone, so you can open the topic that matches your project. For project-specific guidance, send the council letter, plans or site address through the contact page.

You can also call 08000 CIVIL or email information@civiease.co.nz.

Beyond the guides

When reading isn't enough and you want the paperwork handled, that's the day job:

Rather have the paperwork handled than explained?

Send it through. We'll review it and respond with a clear scope, usually within one working day.

Send Plans or Council Letter Call 08000 CIVIL