Corridor Access Request in Christchurch, step by step
If you're digging in the road berm, connecting services across the footpath, putting a skip bin on the street or occupying any part of Christchurch's road corridor, you need a Corridor Access Request (CAR) approved by Christchurch City Council before work starts — not after the crew arrives. The process runs: lodge in MyWorksites → council reviews and sets conditions → Works Access Permit issued → do the work → submit a Work Completion Notice → two-year warranty period. This page walks through every step, including what gets applications bounced.
Too busy to run this yourself? Our corridor access (CAR) support team lodges and manages the whole application — with CCC, Selwyn, Waimakariri, Environment Canterbury's road managers or any road controlling authority in NZ.
Too busy to run the CAR yourself?
Send it through — we'll identify the next step, usually within one working day.
Do you actually need a CAR?
A CAR is required for almost any work or occupation in the road corridor — that's the legal road, which includes the carriageway, the footpath and the grass berm, not just the sealed surface. Common triggers:
- Trenching or drilling for services (water, wastewater, fibre, power, stormwater)
- Building or altering a vehicle crossing (driveway entrance)
- Scaffolding, containers or skip bins on the berm or road
- Cranes or concrete pumps set up on the road
- Road opening for repairs, or any occupation that affects traffic or pedestrians
If your work is entirely inside private property and never touches the corridor, you don't need a CAR. The moment a machine, material, bin or pedestrian diversion crosses the boundary, you do. When in doubt, assume yes — working in the corridor without an approved CAR can get the job shut down on the spot, and "the crew was already booked" is not a defence the corridor team accepts. The permit costs a fraction of an idle crew day.
CAR vs WAP vs TMP — the three things people confuse
| What it is | Who issues/approves it | When you need it | |
|---|---|---|---|
| CAR (Corridor Access Request) | The application to work in the road corridor | You lodge it with the road controlling authority (RCA) — for Christchurch streets, CCC | Before any corridor work is planned |
| WAP (Works Access Permit) | The approval the RCA issues once your CAR is accepted, with conditions | The RCA | Before work physically starts |
| TMP (Traffic Management Plan) | The document describing how traffic and pedestrians are kept safe around your work | Prepared by a qualified TMP designer; approved as part of the CAR | Required with almost every CAR that affects traffic, parking or pedestrians |
In plain terms: the CAR is you asking, the TMP is how you'll do it safely, the WAP is council saying yes. Most CAR applications are incomplete without a TMP — and the TMP is where most DIY applications stall. If you need one, see what a TMP costs in NZ before you budget.
Step 1: Scope the work and lock in dates
Every bounced application we've seen started life as a vague scope. Before you open any form, nail down:
- The exact location (street address, and where relative to intersections, driveways and bus stops)
- What you're doing and how deep/wide the excavation or occupation is
- Start and end dates — realistic ones, with weather and programme buffer
- Who is doing the work and who the on-site contact is
Vague scopes get bounced. "Service connection" is a scope; "open trench across footpath for a 32mm water connection, reinstated same day" is a better one.
Step 2: Get your TMP sorted
Almost every CAR that touches the carriageway, footpath or parking needs a traffic management plan prepared to the NZ Guide to Temporary Traffic Management (NZGTTM) risk-based approach. The TMP has to match the actual road environment — traffic volume, speed, pedestrians, cycle lanes — and be designed by someone qualified to do it.
Get the TMP drafted before you lodge the CAR. Lodging first and promising a TMP later is the classic way to get a "more information required" response and lose your start date.
Step 3: Lodge the CAR in MyWorksites
Christchurch City Council — like most NZ road authorities, including Auckland Transport — takes corridor access applications through MyWorksites (myworksites.co.nz), the national corridor-management system. Some authorities use the related CorridorAccess platform; the workflow is the same.
The lodgement flow:
- Create an account (or use your company's) and start a new Corridor Access Request.
- Drop the work location on the map. The system assigns your request to the right RCA automatically.
- Describe the work — activity type, excavation details, dates, methodology.
- Attach the TMP and any supporting documents (methodology, photos, service plans).
- Declare traffic impacts — lane closures, footpath diversions, parking loss.
- Submit. You get a reference number; the RCA's corridor team picks it up from there.
Fill every field as if the reviewer has never seen your site — because they haven't. The fields that most often cause bounces: wrong or optimistic dates, missing TMP, unclear excavation dimensions, and no traffic-impact declaration when there obviously is one.
Step 4: RCA review and conditions
The corridor team reviews the CAR against the road network: other works nearby, planned events, network condition, and whether your TMP is adequate. They can:
- Approve and move to issuing the permit
- Request more information (this is where incomplete applications stall)
- Decline if the timing or location genuinely conflicts with the network
Expect conditions on the permit: working hours, reinstatement standards, notification duties, inspection points. Read them — breaching permit conditions is how contractors end up on an RCA's problem list.
Step 5: The Works Access Permit (WAP)
The WAP is the document that lets you physically start. Check it against your programme:
- Dates — do the approved dates match your crew booking?
- Conditions — hours of work, noise windows, reinstatement spec
- Notification requirements — many permits require you to notify the RCA (and sometimes residents) a set number of days before starting
Do not let the crew start before the WAP is in hand and within its validity dates. "The CAR was approved" is not the same as "the permit is issued and current."
Step 6: During the works
- Keep the approved TMP set up as designed — the RCA or its auditors can and do inspect sites.
- If anything changes (scope, dates, traffic setup), contact the corridor team before improvising. Variations can be approved; surprises can't.
- Reinstate to the permit's standard: compaction, surface, berm condition. Photograph everything — your photos are your warranty defence two years from now.
Step 7: Work Completion Notice and the two-year warranty
When the work's done and the corridor is reinstated, you submit a Work Completion Notice through MyWorksites. The RCA may inspect the reinstatement. From acceptance, a two-year warranty period typically applies to your reinstatement work — if the trench settles or the patch fails in that window, it's yours to fix. After the warranty closes clean, the job is fully off your books.
Skipping the completion notice is a common, expensive oversight: the CAR stays open on the system and the warranty clock never properly starts.
Lead times and common bounces
How far ahead should you lodge? It depends on the RCA and the complexity:
- Straightforward works on Christchurch streets: lodge at least 10–15 working days before your start date; simple low-impact jobs can move faster, but don't bet a crew booking on it
- Complex or high-impact works (arterials, road closures): allow several weeks
- Auckland Transport: a minimum of 15 working days before work starts — genuinely plan earlier than Canterbury
The bounces we see most: no TMP attached, TMP not matching the site, dates already past, missing methodology for excavations, and CARs lodged for the wrong road (state highways are NZTA's corridor, not the local council's).
One more Christchurch-specific wrinkle: knowing whose corridor you're in. Local streets are CCC. State highways through the city — the likes of the Christchurch Northern Corridor, SH1 and SH73 sections — are NZ Transport Agency Waka Kotahi, with their own CAR process. Selwyn and Waimakariri district roads belong to those councils. MyWorksites routes your request to the right authority based on your map pin, but your lead time and reviewer change with the road — so pin accurately.
If you're lodging CARs weekly across multiple councils — CCC one week, Selwyn or Waimakariri the next — our standing support for civil contractors exists precisely for that volume problem.
Crew booked and no permit yet?
Send it through — we'll identify the next step, usually within one working day.
Frequently asked questions
What is a Corridor Access Request (CAR) and when do I need one?
A CAR is the application you lodge with the road controlling authority for permission to work in or occupy the road corridor — the carriageway, footpath and berm. In Christchurch, that means Christchurch City Council for local roads. You need one for trenching, service connections, vehicle crossings, scaffolding, skip bins on the berm — essentially anything that touches the corridor.
What is a Works Access Permit (WAP) and how is it different from a CAR?
The CAR is the request; the WAP is the approval. You lodge a CAR describing the work, location and traffic management; the road authority reviews it and issues a Works Access Permit with conditions and validity dates. You can only start work once the WAP is issued and current — an approved CAR alone doesn't get the digger moving.
How do I apply for a CAR in MyWorksites, and how far ahead?
Create a MyWorksites account, start a Corridor Access Request, pin the location on the map, describe the work and dates, attach your TMP and methodology, and submit — the system routes it to the right road authority. Lodge at least 10–15 working days ahead for Christchurch works; Auckland Transport requires a minimum of 15 working days.
Do I need a permit to put a skip bin, container or scaffolding on the road or berm?
Yes. The berm and road are part of the legal road corridor, so placing a skip bin, shipping container or scaffolding there needs a CAR approved by Christchurch City Council before delivery. If the bin or scaffold affects traffic or pedestrians, a TMP may be required with it. On fully private property, no CAR is needed.
Related reading
- What a TMP costs in NZ — the document your CAR probably needs
- Vehicle crossings in Christchurch: consent, CAR, TMP and inspection — the most common homeowner CAR
- Corridor access (CAR) support — we handle the application end to end
- Browse all guides — the full library of straight-answer resources
Want the CAR lodged and managed for you?
Send it through — we'll identify the next step, usually within one working day.